How to Get BBMP Plan Approval
24
Jun

Step-by-Step Guide to Getting BBMP Home Plan Approval (2025 Edition)

Planning to build your home in Bengaluru? One of the most critical steps before you lay the foundation is getting your house plan approved by BBMP (Bruhat Bengaluru Mahanagara Palike). The good news? The process has become faster and more transparent — especially when you’re supported by experienced firms like Sribha Infra Build.

In this article, we’ll break down the step-by-step process for BBMP plan approval and show how Sribha Infra Build ensures a tension-free experience from start to finish.

Sribha Infra Build BDA BBMP Site Approval

Why BBMP Plan Approval Is Mandatory

Before starting construction on any residential or commercial property in Bangalore city limits, it’s legally required to obtain BBMP building plan approval. This ensures:

  • The structure follows zoning and building bye-laws
  • No encroachments on lake beds, drains, or road widening areas
  • Safe and sustainable urban development

How Sribha Infra Build Makes Plan Approval Tension-Free

Sribha Infra Build is a professional urban planning and design consultancy specializing in BBMP-approved building plans, layout development, and statutory compliance.

Here’s how they simplify your approval journey:

  • In-house BBMP-licensed architects and engineers
  • Compliance-first designs to avoid rejection
  • Digital submission through BBMP’s Nambike Nakshe portal
  • Liaisoning for NOCs (BWSSB, BESCOM, Fire, etc.)
  • Follow-up & escalation support with BBMP town planning officials

Their team ensures zero delays, full compliance, and transparent communication, making the experience truly tension-free.

Step-by-Step Process for BBMP Building Plan Approval in 2025

agents for BBMP plan approval

Step 1: Confirm Site Eligibility

  • Plot must be within BBMP limits
  • Preferably 50×80 ft or smaller (eligible for fast-track approval)
  • Zone must match intended use (residential, commercial, etc.)
  • No legal disputes or encroachments

Sribha helps you verify zoning through RMP-2031 and digital GIS tools.

BBMP Plan Approval for Building my home

Step 2: Appoint an Empanelled Architect via Sribha

You cannot directly apply as an owner. Only BBMP-empanelled architects or engineers can submit plans.

Sribha Infra Build has registered professionals on their team who

  • Inspect your plot
  • Design a bylaw-compliant building plan
  • Handle submission and all official correspondence
Where to get BBMP Plan approved

Step 3: Prepare and Submit Required Documents

Typical documents include:

  • Sale deed / title deed
  • Khata certificate & extract
  • Latest tax paid receipt
  • Survey sketch / site plan
  • Building drawings (PDF + DXF)
  • Owner ID and address proof

Sribha provides a checklist and collects everything needed, including drafting drawings and digitizing your documents.

Best Civil Contractors Sribha Infra Build

Step 4: Upload the Plan via BBMP Online Portal

The architect logs into BBMP’s OBPAS (Online Building Plan Approval System) or Nambike Nakshe portal, uploads plans, and completes form submission.

The system uses auto-verification tools to flag any bylaw violations.

Portal: bbmp.gov.in

Step 5: Pay Plan Approval Fees

Fee structure includes:

  • Plan scrutiny fees
  • Betterment charges (if applicable)
  • Development fees

All payments are made online and receipts generated immediately. Sribha calculates your fee slab, ensures accurate estimates, and makes the payments on your behalf if authorized.

Step 6: Get Instant Provisional Plan Sanction

Once the fee is paid and the plan passes checks:

  • BBMP issues Provisional Sanction for eligible sites
  • This allows you to begin basic site work

This step now takes less than 48 hours for most residential plots.

Step 7: Final BBMP Approval Within 15 Days

Your file is digitally reviewed by BBMP’s Assistant Director, Town Planning. If there are no violations or objections, your building plan is:

  • Sanctioned within 15 working days, or
  • Deemed approved if no action is taken

With Sribha Infra Build tracking your file, there are no delays, and any objections are quickly resolved.

If you want a builder who delivers quality construction with honest communication, consider Sribha Infra Build—your local home-building partner in Bangalore.

Step 8: Begin Construction with Compliance Monitoring

During construction, BBMP now requires:

  • Stage-wise affidavits at plinth, first floor, and roof levels
  • Monthly inspections by ward engineers
  • Adherence to approved setback and height rules

Sribha coordinates your affidavits, manages BBMP inspections, and ensures compliance till completion.

Step 9: Apply for Occupancy Certificate (OC)

After construction:

  • Submit final photos, completion report, and all affidavits
  • BBMP conducts a final inspection
  • Occupancy Certificate is issued within 30 days

Only with an OC can you get permanent water/electricity connections.

Why Sribha Infra Build Is the Smart Choice for BBMP Plan Approvals

Feature Sribha Infra Build Advantage
BBMP-Licensed Experts Empanelled architects & civil engineers
Compliance Support Plans are 100% bylaw-compliant
Liaison Services Get NOCs from BWSSB, BESCOM, AAI, etc.
End-to-End Digital Filing No BBMP visits, zero follow-up stress
Timely Follow-ups Weekly tracking of file status
Transparent Workflow Clear costing, regular updates, and compliance guarantees

With Sribha Build Smart, Build Legal

Getting your BBMP house plan approved in Bangalore is no longer a nightmare. With digital portals, time-bound processing, and professional help from Sribha Infra Build, you can enjoy a stress-free, legally sound, and quick building approval process. So whether you’re constructing a new house, extending an existing one, or building a duplex — make sure to do it the right way, the Sribha way.